Thursday, January 29, 2009
Floor jig-saw
Saturday, January 24, 2009
Bottom of b (?) post
Wednesday, January 21, 2009
Finished off the door pillar bottom
kitchen drawer (thanks to Stevie!) to add in the channel for the door seal. The original was missing from this side. I'm pleased with the end result. I then folded over the front apron lip and tacked it at the bottom. It needs a final tidy up here and there but it's largely done. I'm going to do the underside of the floor panel to make sure it is in properly before taking off the braces. Then I'll hand the door again and see what it looks like.
Monday, January 19, 2009
Front floor (nearly) welded in
done the seam and the spot welds on the edges. Just need to turn it over now and put a few welds on the underside before finishing off the little bits and pieces like the lip to take the kick panel at the bottom. I'll probably make it up with a bit of thin metal. I plan to also take back the rest of the cab floor down to bare metal and give it a good coat of paint. There's a few pin holes that need welded up too. I'm going to try and blitz the wee jobs this week.
Saturday, January 17, 2009
Subscribe to:
Posts (Atom)