Tuesday, March 24, 2009
Preping for the load bed.
Wednesday, March 18, 2009
Saturday, March 14, 2009
Take 1 on the load bed
I've made a start on the load bed this evening. I'm opting for plan A in the first instance. I had a long single cab section which I'm going to cut the middle section out of and weld the two ends together. The old addage of measure twice cut once was recited a few times. Anyways, here's a
few snaps of the cutting and putting together. I haven't welded it up yet as I need to figure out the best way of getting the two parts welded together. I'll take my time over it as if I get it right it will mean I don't need to mess around with the joining lip.

Friday, March 13, 2009
sin e a-nis
Wednesday, March 11, 2009
As my grandpa used to say....
Tuesday, March 03, 2009
Underside tubbing for Eberspacher in
Here's a few snaps of where I've joined the underside of the Eberspacher into the main heater tube.
Trial fit of the Eberspacher join onto the heater tube. Yes - it's the end of a rusty fuel tank!
Final tube welded in showing piping from inside the cab. I'll route the heater tube around the back but need to put the beam in, handbrake cables and gear linkage to see where the best routing is.
Monday, March 02, 2009
Finished the Eberspacher for now
Sunday, March 01, 2009